Amphitheater |
Volunteer |
|
|
Troop |
Scoutmaster |
|
|
|
|
clean area as needed |
|
|
|
Repair Benches as needed |
|
|
|
|
|
|
|
|
|
| |
|
|
|
Archery Range |
Volunteer |
|
|
Troop |
Scoutmaster |
Crew of 4 to 8 to install metal
roofing and metal siding on new building |
556 |
Lowry Blakeburn |
Build frame, & Install Trim and doors |
|
Bill Anderson |
|
Clear Trail for entrance from road |
|
|
|
Make and Install signs by both entrances |
|
|
|
Metal KEEP OUT signs on fence |
|
|
| |
|
|
|
Chapel |
Volunteer |
|
|
Troop |
Scoutmaster |
|
Clean up area including remove dirt
washed on slab |
|
|
|
|
|
|
| |
|
|
|
Cook's Quarters |
Volunteer |
|
|
Troop |
Scoutmaster |
|
|
|
|
|
|
|
|
| |
|
|
|
Dining Hall |
Volunteer |
|
|
Troop |
Scoutmaster |
|
Repair door sill on SE door |
|
|
|
Install 1/4" screen on large portable
fans |
|
|
|
Repair screens as necessary |
|
|
| |
|
|
|
Eagle Quest |
Volunteer |
|
|
Troop |
Scoutmaster |
|
Repair fencing as necessary |
|
|
|
General Clean up |
|
|
|
Pour & Finish 10'x12' concrete pad |
|
|
| |
|
|
|
Handicraft |
Volunteer |
|
|
Troop |
Scoutmaster |
Crew of 4 to 6 to install insulation
and plywood on workroom ceiling |
509 |
Steve Leonard |
Crew of 2 to 4 to build counter for
workroom |
828 |
Phil Hanson |
Build and Install free standing
bulletin board |
505 |
Ken Black |
|
|
|
|
| |
|
|
| |
|
|
|
Health Lodge |
Volunteer |
|
|
Troop |
Scoutmaster |
|
Thoroughly Clean, wash walls, wash and
wax floor, wash windows |
|
|
|
Clean light fixtures |
|
|
|
Install Metal Roof |
|
|
|
|
|
|
| |
|
|
|
Kitchen |
Volunteer |
|
|
Troop |
Scoutmaster |
|
Repair Ice Maker |
|
|
|
Steam clean floors |
Staff |
|
|
Fix broken window |
Staff |
|
|
|
|
|
| |
|
|
|
Nature Center |
Volunteer |
|
|
Troop |
Scoutmaster |
Build and Install free standing
bulletin board |
505 |
Ken Black |
|
|
|
|
Assemble 6 Work Tables |
549 |
Frank Tracy |
|
|
|
|
| |
|
|
| |
|
|
|
Pool |
Volunteer |
|
|
Troop |
Scoutmaster |
|
Paint Baskets |
|
|
Pull well and install new valve and
casing |
|
Gene Reynolds |
Remove loose tile around pool edge |
524 |
Bob Duckwall |
|
Clean all shower areas |
|
|
Repair and Paint Outside of Change
room enclosure |
524 |
Duckwall/Reynolds |
| |
|
|
|
Rifle Range |
Volunteer |
|
|
Troop |
Scoutmaster |
Clean Grounds |
818 |
Justin Jones |
Tighten Fence to south on west end |
818 |
Justin Jones |
Extend fence to east across path and
road (fencing supplied) |
818 |
Justin Jones |
Metal KEEP OUT signs hung on fence |
818 |
Justin Jones |
| |
|
|
| |
|
|
|
Shotgun Range |
Volunteer |
|
|
Troop |
Scoutmaster |
|
|
|
|
Paint Buildings |
549 |
Terry Vannoy |
|
Install Flag Pole w/halyard |
|
|
|
Metal KEEP OUT signs on fence |
|
|
| |
|
|
|
Staff Area |
Volunteer |
|
|
Troop |
Scoutmaster |
crew of 2 - 4 to form up concrete
tent pads sites |
|
Findahl |
crew of 4 to 10 to pour & finish
concrete tent pads (will do May 23rd) |
820 |
Lyle Eastman |
|
|
|
|
| |
|
|
|
Trading Post |
Volunteer |
|
|
Troop |
Scoutmaster |
|
Clean Grounds |
|
|
|
|
|
|
| |
|
|
|
Water Front |
Volunteer |
|
|
Troop |
Scoutmaster |
|
Clean area as needed |
|
|
Build and install new pier |
828 |
Bill Anderson |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
Stillwater Rotary |
Volunteer |
|
|
Troop |
Scoutmaster |
|
|
|
Verify all drains clear |
818 |
Justin Jones |
Clean area as needed |
818 |
Justin Jones |
| |
|
|
|
Kiwanis |
Volunteer |
|
|
Troop |
Scoutmaster |
|
|
|
|
|
|
|
|
|
Verify all drains clear |
549 |
Frank Tracy |
Clean area as needed |
556 |
Lowry Blakeburn |
| |
|
|
|
Knights of Columbus |
Volunteer |
|
|
Troop |
Scoutmaster |
|
|
|
|
|
|
|
|
|
Verify all drains clear |
505 |
Ken Black |
Clean area as needed |
505 |
Ken Black |
| |
|
|
|
Sac & Fox |
Volunteer |
|
|
Troop |
Scoutmaster |
Remove down tree limbs |
509 |
Steve Leonard |
Remove stumps (tripping hazards) |
509 |
Steve Leonard |
Verify all drains clear |
509 |
Steve Leonard |
|
|
|
Clean area as needed |
509 |
Steve Leonard |
| |
|
|
|
Pioneer |
Volunteer |
|
|
Troop |
Scoutmaster |
|
|
|
Install metal fire ring in rock
lining (second fire ring) |
828 |
Scott Mitchell |
Verify all drains clear |
828 |
Scott Mitchell |
Clean area as needed |
828 |
Scott Mitchell |
| |
|
|
|
Steve Evans |
Volunteer |
|
|
Troop |
Scoutmaster |
Remove second fire ring |
828 |
Scott Mitchell |
Clean area as needed |
828 |
Scott Mitchell |
Verify all drains clear |
828 |
Scott Mitchell |
Clean area as needed |
828 |
Scott Mitchell |
| |
|
|
|
White Eagle |
Volunteer |
|
|
Troop |
Scoutmaster |
Remove second fire ring |
524 |
Bob Duckwall |
nre gutter on building |
|
|
Verify all drains clear |
524 |
Bob Duckwall |
Clean area as needed |
524 |
Bob Duckwall |
| |
|
|
|
Elmer Heard/Osage |
Volunteer |
|
|
Troop |
Scoutmaster |
|
New sign on road |
|
|
|
Verify all drains clear |
|
|
|
Clean area as needed |
|
|
| |
|
|
|
Elmer Heard |
Volunteer |
|
|
Troop |
Scoutmaster |
|
j-bolt to support hand washing pipe |
|
|
|
Install Toilet Can (can supplied) |
|
|
|
Replace shingles on latrine (about 1
square) |
|
|
|
Replace broken Plexiglas on cabin 28x24 |
|
|
|
Verify all drains clear |
|
|
|
Clean area as needed |
|
|
| |
|
|
|
Osage |
Volunteer |
|
|
Troop |
Scoutmaster |
|
|
|
|
Clean area as needed |
|
|
|
Verify all drains clear |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
89er |
Volunteer |
|
|
Troop |
Scoutmaster |
|
|
|
|
|
|
|
Install toilet can in latrine (can
supplied) |
828 |
Phil Hanson |
Replace broken boards on latrine |
828 |
Phil Hanson |
Verify all drains clear |
828 |
Phil Hanson |
Clean area as needed |
828 |
Phil Hanson |
| |
|
|
|
Pawnee Bill |
Volunteer |
|
|
Troop |
Scoutmaster |
|
|
|
|
|
|
|
|
|
Replace missing boards on shower |
133 |
Steve Brown |
Timbers around shouers & latrine |
133 |
Steve Brown |
Replace broken boards on latrine |
133 |
Steve Brown |
Install metal fire ring in rocks
(ring provided) |
133 |
Steve Brown |
Verify all drains clear |
133 |
Steve Brown |
Clean area as needed |
133 |
Steve Brown |
| |
|
|
|
Boomer |
Volunteer |
|
|
Troop |
Scoutmaster |
Replace roof on Latrine |
377 |
Gene Reynolds |
|
Install can in latrine (can provided) |
377 |
Gene Reynolds |
|
Repair boards on latrine. |
377 |
Gene Reynolds |
Clean area as needed |
377 |
Gene Reynolds |
| |
|
|
|
Gilwell Field |
Volunteer |
|
|
Troop |
Scoutmaster |
|
Finish rock retaining wall on stage |
|
|
|
Finish rock retaining wall at edge of
field |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|